Geospatial Application Profile

From DigiRepWiki

(Difference between revisions)
Revision as of 11:08, 2 November 2007
JamesReid (Talk | contribs)
Draft Documents for Working Group meeting 29th October
← Previous diff
Revision as of 11:10, 2 November 2007
JamesReid (Talk | contribs)
Introduction
Next diff →
Line 2: Line 2:
This page is part of the JISC Digital Repository Wiki. It is used to support the activities of a UK (JISC) working group which is developing an Application Profile for describing geospatial resources held in institutional repositories. This page is part of the JISC Digital Repository Wiki. It is used to support the activities of a UK (JISC) working group which is developing an Application Profile for describing geospatial resources held in institutional repositories.
-This work is being undertaken within the JISC Digital Repositories programme and coordinated by James Reid at EDINA National Datacentre(Geoservices). The Geospatial Application Profile project is running from November 2007 - April 2008.+This work is being undertaken within the JISC Digital Repositories programme and coordinated by James Reid at EDINA National Datacentre (Geoservices). The Geospatial Application Profile '''(GAP)''' project is running from November 2007 - April 2008.
== Draft Documents for Working Group meeting 29th October == == Draft Documents for Working Group meeting 29th October ==

Revision as of 11:10, 2 November 2007

Contents

Introduction

This page is part of the JISC Digital Repository Wiki. It is used to support the activities of a UK (JISC) working group which is developing an Application Profile for describing geospatial resources held in institutional repositories.

This work is being undertaken within the JISC Digital Repositories programme and coordinated by James Reid at EDINA National Datacentre (Geoservices). The Geospatial Application Profile (GAP) project is running from November 2007 - April 2008.

Draft Documents for Working Group meeting 29th October

Deliverables

Functional Requirements

Model

Application Profile

Usage Guidlelines

Community Acceptance Plan

Final report

Workplan

TBD

Working Group

Background

Meetings

TBC